Circular Mineral Processing

Engineering a More Circular Future for Mineral Processing

We integrate mineral process engineering, plant optimization and technical procurement with circularity, innovation and optimization — maximising resource potential while decoupling production from environmental impact.

“More value from every tonne of ore, every drop of water, and every unit of energy.”

Explore Circular Solutions
Company perspective

Why Circular Economy?

Circularity in mineral processing does not begin at end-of-life recycling. It begins inside the flowsheet.

Recover More
Increase recovery from the ore and from streams traditionally lost.
Consume Less
Reduce water, energy and consumables per tonne of product.
Reuse More
Recirculate process water, materials and other resources.
Waste Less
Reduce tailings and process residues where feasible.
Recover from Waste
Extract value from tailings and historical waste deposits.
Extend Asset Value
Optimise, retrofit and upgrade to extend productive life.
Traditional way
Ore Processing Product + Tailings Disposal
Value leaves the system once. Tailings are the end of the line.
VS
The circular way
Ore
Efficient Processing
Product
nothing exits as waste
Water → Reuse Minerals → Recovery Tailings → Reprocessing
Section recap · 01

From Conventional Plants to Circular Plants

Higher value → Higher throughput
Water circularity → More freshwater
Resource recovery → Waste disposal
Advanced recovery → Declining ore grades
Optimizing them → Replacing existing assets
Circular processing → Linear processing
Prevent Reduce Recover Reuse Reprocess Safely Store

“We engineer solutions that make mineral processing more productive, more resource-efficient and more circular.”

Industry-focused content

Articles & Insights

Three positions on where circularity actually starts in a concentrator — the resource case, the water case and the tailings case. Each is summarised in the sections that follow and published in full.

Article 01

From Resource Consumption to Resource Circularity

Why the transition is becoming essential, and where circularity starts.

Read article 6 min
Article 02

Water Circularity in Mineral Processing

Why the future of mineral processing depends on water efficiency.

Read article 5 min
Article 03

Tailings: From Waste to Circular Resource

Rethinking the last stream of mineral processing.

Read article 9 min
Selected industrial experience

Our Projects

Four plants, built and running, that turn low-grade ore, mine waste and plant tailings into saleable iron concentrate.

Project 01 · Tailings reprocessing

Low-Grade Tailings Reprocessing Plant

350 ktpa
hematite concentrate
20–30 % → >64 %
Fe grade, feed to concentrate
View project
Project 02 · Mining waste

Magnetite–Hematite Mining-Waste Beneficiation Plant

850 ktpa
iron concentrate
25–32 % → 66 %
Fe grade, feed to concentrate
View project
Project 03 · Hybrid circuit

Hybrid Magnetite–Hematite Concentrator

2.5 Mtpa
concentrate, both products
67 % Fe
magnetite concentrate
View project
Project 04 · High-silica ore

High-Silica Magnetite Concentrator

5 Mtpa
magnetite concentrate
20 Mtpa
plant feed
View project
Project 05 · Western Australia · In development Yogi Magnetite Iron Ore Project Greenfield magnetite operation with its own village, process plant and hybrid power plant, developed to run for the life of the mine.
5 Mtpa magnetite concentrate
16 yr life of mine
900 personnel housed
125 ha power plant area
Engineering Solutions

From Conventional Processing to Improved Performance

Three ways a concentrator reaches us: it needs a product it cannot currently make, it needs more out of the circuit it already runs, or it does not exist yet. The engineering is the same discipline in all three — the constraints are what differ.

Beneficiation
Concentrate production from iron and copper ores — separation, recovery and product quality against a stated specification.
Modification / Brownfield
Retrofits and upgrades inside a running plant, where the existing circuit and the shutdown window are the real constraints.
Greenfield
New concentrators taken from ore characterisation through to a defined, costed flowsheet.
Six-stage delivery model How we deliver
01 Understand
02 Assess
03 Design
04 Engineer
05 Procure
06 Optimize
06 returns to 01 — optimization feeds the next cycle

“Our role does not end when the equipment is specified. It ends when the solution delivers measurable value.”

Engineering Solutions · 01

Decisions Made Before Equipment Is Specified

Most of the value in a concentrator is fixed by choices made long before procurement opens. Consulting is where we test those choices against the ore, the water, the power and the economics that will actually apply.

Flowsheet evaluation
Where the circuit loses recovery, capacity and water — stage by stage, with numbers.
Technology assessment & selection
Which separation route the ore actually justifies, not the one currently in fashion.
Technical due diligence
Independent review of an asset, a study or a vendor claim before capital commits.
Feasibility support
Process input to scoping, pre-feasibility and feasibility studies at the required level of definition.
Metallurgical assessment
Ore characterisation and testwork interpreted into design criteria a plant can be built to.
CAPEX & OPEX assessment
What each option costs to build and — more decisive — to run per tonne of product.
Technical risk assessment
The assumptions that would hurt most if wrong, ranked and given a mitigation.

An independent opinion is only useful if it can say no to the option that pays us more.

Engineering Solutions · 02

More From the Plant You Already Own

Ore grades decline, water gets scarcer and the circuit was designed for the deposit as it was understood a decade ago. Optimization closes that gap inside the existing asset, without waiting for a new plant.

Recovery improvement
More of the payable mineral out of the same feed, from the same circuit.
Capacity enhancement
Debottlenecking to lift throughput without building a second circuit.
Water consumption reduction
Less freshwater per tonne through process water recovery and recirculation.
Energy efficiency
Comminution, pumping and dewatering energy per tonne of product.
Tailings reduction & reprocessing
Less residue generated, and residual value pulled back out of what remains.
Fine particle recovery
The fraction conventional circuits send to tailings by design rather than by choice.
Equipment & circuit optimization
Duty, sizing and configuration matched to the ore as it behaves today.

Every improvement is stated as a number the plant can verify: recovery, tonnes, m³ per tonne, kWh per tonne.

Procurement Solutions

Procurement Led by the Engineers Who Specified the Duty

Equipment is bought against a process duty, not a catalogue line. The same people who assess the flowsheet write the specification, read the bids and hold the vendor to the schedule — so a procurement decision stays a technical decision from enquiry to readiness for shipment.

01 Sourcing Vendor search · RFQ 02 Evaluation Technical · Commercial 03 Award Negotiation · PO 04 Expediting Readiness for shipment
Technically led
Specifications, bid evaluations and deviation reviews are written by process and mechanical engineers, not by a buying desk.
Vendor-independent
We hold no agency or supply agreements. Recommendations follow the duty, the lifecycle cost and the schedule risk.
Scope you can audit
A single register carries every enquiry, offer, deviation and promised date from stage 01 through to shipment readiness.

Our scope culminates at readiness for shipment. International freight, shipping and customs sit outside it — stated plainly, because knowing where a scope ends is part of delivering it.

Procurement · Stages 01–03

From Enquiry to Purchase Order

01 Sourcing
Building a shortlist that can actually meet the process duty — not the longest list available.
Vendor identification and market screening
Supplier qualification and capability review
Global supplier network access
RFQ package preparation from the process spec
Enquiry issue and technical clarification
02 Evaluation
Offers compared on what they will deliver in the circuit, at what running cost.
Technical evaluation against process duty
Commercial comparison and bid tabulation
Deviation and exception review
Spares, wear-part and lifecycle cost review
Vendor coordination and query resolution
03 Award
A clean handover into manufacturing, with the schedule fixed before the first cut of steel.
Negotiation support and clarification closeout
Terms, warranty and performance-guarantee review
Purchase order placement
Vendor document register and approval route
Kick-off meeting and schedule baseline

Every award is traceable: what was asked for, what was offered, what was accepted and why.

Procurement · Stage 04

Expediting Is Where Schedules Are Held

The window between purchase order and readiness for shipment is where most equipment schedules quietly slip. We hold that window: sitting between client and vendor, reading manufacturing progress against the promised dates, and raising a recovery plan while it is still a recovery plan.

Single point of contact Core differentiator
Client
↔
PMTS
↔
Vendor
Progress review Document follow-up Delay prevention
Reporting cadence
Weekly Progress report against the baselined manufacturing schedule.
Milestone Verification at material release, fabrication, assembly and testing.
On slip Cause, revised date and recovery plan raised with the client the same week.
Manufacturing follow-up
Direct contact with the vendor works, not the sales office.
Progress monitoring and reporting
Actual percentage complete against the promised curve.
Schedule control and recovery
Slippage flagged early, with options rather than a new date.
Vendor document follow-up
Drawings, data sheets and test records chased to approval.
Inspection and FAT coordination
Witness points scheduled, attended and reported.
Readiness for shipment — scope ends here
Packing, marking and documentation confirmed complete. Freight, shipping and customs sit outside our scope.
Section recap · 04 + 05
E
Engineering
Beneficiation, brownfield modification and greenfield — with consulting and plant optimization inside it, not alongside it.
+
P
Procurement
Sourcing through expediting, ending at readiness for shipment. Freight and customs are excluded by design.

Two delivery arms, one scope boundary — and no ambiguity about where either ends.

Corporate profile

Three Disciplines, One Flowsheet

Thirty years from magnet to flowsheet.

Mineral Processing Engineering Circularity

We began by designing and manufacturing magnetic systems and equipment, building our expertise from the ground up, and evolved into a technology-driven engineering company. Today our engineering solutions and installed facilities produce over 20 million tonnes of iron ore concentrate annually across global markets — applied to greenfield developments and existing brownfield operations alike.

Our people

A Global Network of Specialists

Our strength lies in the expertise of our people. A global network of highly skilled engineers and renowned mineral processing specialists lets us assemble the right expertise for each project, rather than fitting every project to one fixed team.

Mineral recovery
Process efficiency
Water consumption
Energy intensity
Resource utilization
Tailings generation
Operating costs
Overall plant performance
Section recap · 06

What We Aim to Achieve

“More value from every tonne of ore, every drop of water and every unit of energy.”

Mineral recovery
Process efficiency
Water consumption
Energy intensity
Resource utilization
Tailings generation
Operating costs
Overall plant performance
Global Reach, Regional Base

Partner With PMTS

Operating from Muscat, Oman, PMTS delivers independent engineering expertise, brownfield asset optimization and procurement expediting for mining operators and investors worldwide.

Office
No. 820, 8th Floor, The Office 1991, Al Ghubrah, Muscat, Sultanate of Oman
Inquiries
Telephone
Submit RFQ / Project Brief